2003 6.0L Power Stroke – RUNNING CHANGES – Turbocharger Oil Supply Line: Installation

• Once the oil supply line has been pressed into the cooler, the collar should be positioned and the retaining bolt             installed.
• Prior to tightening the retaining bolt, reposition the oil supply line, as necessary, in order to install the two turbo         mounted oil supply line bolts, located on the center section of the turbo.
• Torque all bolts to specification.