Category Archives: 1025R

John Deere – 1023E, 1025R and 1026R – Test HST Charge Pressure

Perform this test to check HST charge pressure. This determines if there is sufficient oil pressure to transmission. [1] – Park machine safely. [2] – Lock park brake. [3] – Remove center closeout panel. See Remove and Install Center Closeout Panel in Section 90, Group 15. [4] – Remove plug from pressure test port (A).… Read More »

John Deere – 1023E, 1025R and 1026R – Test PTO Cluch Pressure

Perform this test to check PTO clutch hydraulic pressure. This determines if there is sufficient oil pressure to engage PTO clutch. [1] – Park machine safely. [2] – Raise and safely support rear axle. [3] – Lock park brake. [4] – Remove left rear wheel. [5] – Remove plug from pressure test port (A). [6]… Read More »

John Deere – 1023E, 1025R and 1026R – Test SCV Implement Relief Pressure

Perform this test to check condition of the hydraulic SCV relief valve setting (implement operation pressure). This determines if there is sufficient oil pressure to operate implements. [1] – Park machine safely. [2] – Install pressure gauge as follows: Assemble AM105467 coupler, JTO5486 connector, JTO3017 hose, and JTO3345 pressure gauge in pressure port (A). [3]… Read More »

John Deere – 1023E, 1025R and 1026R – Essential or Recommended Tools

→NOTE: Order tools from the SERVICEGARD TM Catalog. ESSENTIAL TOOLS listed are required to perform the job correctly and are obtainable only from the SERVICEGARD TM Catalog. RECOMMENDED TOOLS, as noted, are suggested to perform the job correctly. Some tools may be available from local suppliers or may be fabricated.