1. Position gasket on manifold. Then insert 1-2 bolts through manifold to hold gasket in place.
2. Install manifold attaching bolts finger tight.
3. Verify that gaskets are properly aligned. Tighten manifold bolts to 18-25 lb-ft (24-34 Nโขm) torque.