John Deere – 1023E, 1025R and 1026R – Remove and Install Tie Rod

[1] – Remove cotter pins from castle nuts (A) and remove castle nuts.

[2] – Using a tie rod end separator, remove tie rod ends from spindles.

[3] – Inspect tie rod end boots. If necessary, replace boots.

[4] – Install tie rods:
a. Install two castle nuts to rod ends.
b. Tighten castle nuts (A) to specification.

c. Install the cotter pins. If slots in castle nuts donโ€™t align with holes after tightening, tighten nuts until next slot aligns.

[5] – Lubricate tie rod ends using general purpose grease.