John Deere – 1023E, 1025R and 1026R – Install PTO Valve

[1] –
→NOTE:
Make sure that all O-rings are in place when installing the valve body and
hydraulic pipes.

Install O-rings at transmission case PTO passages.

[2] – Install PTO valve and secure with two bolts (A).

[3] – Make sure that O-rings are in place at valve fittings.

[4] – Install hydraulic pipe nuts (B) to valve fittings. Tighten to specification.

[5] – Install hydraulic pipe nut (C) to valve elbow fitting. Tighten to specification.

[6] – Install wire harness connector (D) to solenoid.

[7] – Install rear wheel. (See “Remove and Install Rear Wheels” in Section 80, Group 10.)