Category Archives: Cummins 4BT

Cummins 4BT – Installing the Pump

Verify Cylinder No. 1 is at TDC by barring engine slowly while pushing in on TDC pin. Install a new gasket. Caution: The drive shaft must be clean and free of all oil before installation. Failure to ensure the drive shaft is free of oil can result in the drive gear slipping on the shaft.… Read More »

Cummins 4BT – Removing the Pump

Caution: Do not remove the control lever. The Bosch VE lever is indexed to the shaft during pump calibration. Disconnect all control linkage. 13 mm Remove the pump support bracket. Remove the access cap and gear retaining nut and washer. 9/16 inch Loosen the CAV fuel injection pump lock screw and po­sition the special washer,… Read More »

Cummins 4BT – Fuel Shut Off Valve Replacement Stanadyne DB4

Removal • Remove the electrical wiring. • Remove the fuel drain line. • Remove the throttle/shutoff linkage. • Remove the fuel injection pump top cover. • Disassemble the fuel injection pump top cover. 5/16 Inch Install new insulating tubes onto the terminals on the terminal studs of the new solenoid. Install the valve into the… Read More »